Skip to content
Realsurv Geospatial Group — home

Engineering survey · Geospatial · Digital engineering

Precision survey for Australia's major infrastructure.

Construction set-out, as-built conformance and 3D geospatial delivery for tier-one contractors on rail, road, tunnel and water programs.

Recent programs

  • CPB — North East Link
  • John Holland — Inland Rail B2A
  • LCRP · Metro Tunnel · West Gate Tunnel

01 / Services

What we deliver on site

Survey crews, instruments and data processing resourced to major-project programs.

  • Construction set-out & control

    Primary and secondary control networks, structure and alignment set-out to design tolerance.

  • As-built & conformance survey

    Conformance reporting and as-built records packaged to client ITP and handover requirements.

  • Rail corridor & track survey

    Track geometry, clearance and possession survey across live and occupied corridors.

  • 3D laser scanning

    Registered point clouds for existing-conditions capture, clash detection and volumes.

  • UAV survey & photogrammetry

    Aerial capture for progress survey, earthworks volumes and site-wide orthophotography.

  • Monitoring & deformation

    Automated and periodic monitoring of structures, retention systems and adjacent assets.

  • Current-generation kit

    The latest software and equipment

    We invest in instruments and software ahead of the program, so survey is never the constraint on a critical path.

  • How we work

    Built to exceed client expectations

    The same crews, supervisors and project history our clients have worked with for years — now resourced under one group.

02 / Projects

Current programs

  • John Holland · 2025 — Current

    Inland Rail — Beveridge to Albury, Tranche 2

    $470M design & construct

    Major upgrades to the North East Rail Line across eight sites between Wandong and Benalla, Victoria, forming part of the 262 km Beveridge-to-Albury section. Road bridge replacements, track lowering, station and platform upgrades and pedestrian underpasses to provide the clearances required for double-stacked freight.

  • CPB Contractors · 2025 — Current

    North East Link

    $1.23 billion

    The Eastern Freeway upgrade from Tram Road to Springvale Road is a major $1.23 billion project delivered by the Synergy consortium (CPB Contractors, BMD Constructions, and Arup) as part of the North East Link Project Target Completion: Slated for completion around 2028, timed to open alongside the main North East Link tunnels and M80 Ring Road completion.

03 / Contact

Send us a scope

Tell us the program, the package and the dates. We will come back with crew availability and a rate submission.

Program, package and dates